Gades

Gades

Stake an Asteroid Drill to collect 3405 iron per day at 1x multiplier. Upgrading the Asteroid Drill will multiply this production according to the drill's stats. The asteroid will accumulate rewards upto the maximum capacity. At this point, resources will need to be harvested before more resources can be mined. Following is the level, max capacity and upgrade required to the next level.

Capacity Level
Capacity
CSC Cost to Upgrade

1

10215

25

2

11747

25

3

13509

25

4

15536

40

5

19420

40

6

24275

75

7

33984

75

8

50977

120

9

76465

150

10

125985

MAX

As times goes on and more people start mining in Gades, its iron production gets reduced. The production of iron is reduced every 30 days for the first 360, decaying to a final base production rate of 1061 iron per day. Following is the data.

Days Since Genesis
Production per Period
Production per Day
CSC Equivalent per Period
% Reduction

30

102150

3405

7.397349555

60

86828

2894

6.287747122

15

90

74672

2489

5.407462525

14

120

64964

2165

4.704492396

13

150

57169

1906

4.139953309

12

180

50880

1696

3.684558445

11

210

45792

1526

3.3161026

10

240

41671

1389

3.017653366

9

270

38337

1278

2.776241097

8

300

35654

1188

2.58190422

7

330

33514

1117

2.426989967

6

360

31839

1061

2.305640469

5

Last updated